In a CSi project Production Hand-over and Site Acceptance Test will lead to the transfer of a technical installation to the responsibility of the customer. With Hypercare the first weeks can be supported.

After that, in first half year or sometimes full year, CSi can help a customer to optimize the functioning of the total system. Many aspects have to be fine-tuned: preventive and corrective maintenance, operations, quality assurance etc. CSi is aware of all these aspects and can help a customer to get to the highest possible level of performance.

By doing this availability levels of far above 99,5% (up to five times 9: 99,999%) have been reached resulting in a near perfect functioning of the systems at the end of the production line.